Pancake Breakfasts

Shaded Fuel Break Project

Before we got started on the Shaded Fuel Break Project, we had a meeting, and then when it started, we had another.

Pancake Breakfasts at the Ranchhouse

2023.09.24 First CalFire Grant Community Meeting
2024.02.03 2nd-2CalFire Grant Community Meeting
2024.02.03 2nd CalFire Grant Community Meeting
previous arrowprevious arrow
next arrownext arrow
Shadow

Little Gnome Before/After

Shaded Fuel Break Project

Little Gnome before and after pictures

Little Gnome Before
ZLittle Gnime After
previous arrowprevious arrow
next arrownext arrow
Shadow

Project Proposal Maps 02-22 thru 02-24

Shaded Fuel Break Project


These maps show the progression of the project as it morphed from one iteration to another.

  1. The original proposal that Kiri and I submitted in February 2022. It was designed for GRA Maintained roads only and all fuel breaks were to be 75' wide for a total of 220 acres.
  2. CalFire contacted us in March and said that the project was too big and we'd need to reduce the size. We submitted the March 2022 map after reducing all the project areas that were not on ridgetops to 50' wide each side of the road for a total of 156 acres.
  3. This is the project as I submitted it in January 2023 and which was approved by CalFire as submitted for a total of 179 acres. Besides projects along the GRA Maintained roads, I also added some private roads.
  4. This is the first amendment to the January 2023 project, amended in January 2024 due to a landowner wishing to do the work himself. Also, a couple of significant errors were discovered and corrected. More project area along private roads was included to make up the difference and keep the project at 179 acres.
  5. This is the second amended version due to a second landowner wishing not to participate. Even more project area along private roads is included as well as areas along Orr Springs Rd to keep the project at 179 acres.
Screenshot_20240313_122402
2 Proposed Project MARCH 2022
Proposed 01-23
Proposed 01-24
Proposed 02-24
previous arrowprevious arrow
next arrownext arrow
Shadow

2022 Projects Before and After

BeforeAfter 2022-2L
BeforeAfter 2022-3L
BeforeAfter 2022-4L
BeforeAfter 2022-5L
BeforeAfter 2022-6L
BeforeAfter 2022-7L
BeforeAfter 2022-8L
BeforeAfter 2022-9L
BeforeAfter 202210L
BeforeAfter 2022-11L
BeforeAfter 2022-12L
BeforeAfter 2022-13L
BeforeAfter 2022-14L
BeforeAfter 2022-15L
BeforeAfter 2022-16L
BeforeAfter 2022 Landscape
previous arrowprevious arrow
next arrownext arrow
Shadow

Document Index

Enter keyword or phrase